Boston skyline at sunset

We build the systems behind the business.

Backend platforms, cloud infrastructure, and applied AI—engineered for production.

Diagnostics

Fitzroy clarifies the technical question, examines the evidence, and defines scope and deliverables before implementation.

Public work

Industrial robot and simulation environment

FastTD3

A public C++17 reinforcement-learning implementation with MuJoCo integration and automated tests. It shows the engineering approach in inspectable code.

View the code
Industrial bid operations workflow interface

Maria Ann

A Fitzroy AI Labs product

Industrial bid-operations software that structures RFQs, clarifications, ownership, issues, and submission readiness around the real workflow.

Business leaders discussing technology priorities

Cloud economics

Respondents to Flexera’s 2026 State of the Cloud survey estimate 29% wasted IaaS/PaaS spend. That supports investigating efficiency—not promising a fixed saving.

Our separate illustrative scenario assumes $500K monthly spend, a 25% achievable reduction, and $250K one-time implementation cost. The figures below are modeled, not measured client outcomes or research-validated returns.

$1.5M
Modeled annual gross savings
$1.25M
Modeled first-year value
2.0 mo
Modeled payback period

Assumes immediate, full-year savings; excludes added recurring costs and ramp-up. Actual savings require workload and billing validation.

Read the research, assumptions, and calculation →Estimate your potential savings

AI production readiness

Fitzroy’s AI Production Readiness Checklist helps leadership teams evaluate production infrastructure, data paths, integrations, controls, governance, and ownership before AI leaves the pilot stage.

Infrastructure and deployment readiness
Data, workflow, and integration dependencies
Governance, controls, and operating ownership
A clearer path from pilot to production
Leadership team evaluating AI production readiness

Delivery model

How we work
01

Scope

Define the system boundary, constraints, acceptance criteria, and first deliverable.

02

Design

Map services, data, dependencies, failure paths, and security boundaries.

03

Build

Implement code, infrastructure, integrations, and tests in reviewable increments.

04

Release

Verify deployment, observability, permissions, rollback, and operational ownership.

05

Improve

Measure behavior, address defects, and iterate with the team.

Fitzroy Insights

Executive Briefing
Newspaper and market research on a professional desk